7th part: examples of tasks requiring ptw — 7. 1 toolbox talk importance

7th part: examples of tasks requiring ptw — 7. 1 toolbox talk importance

Play all audios:

Loading...

> PERFORM THE TBT’s (Toolbox Talk) STRICTLY MANDATORY Toolbox Talk is a 5–10 minutes safety meeting held and recorded by the Performing Authority prior the commencing of any activities;


it is a very powerful communicating tool, useful to spread all the HSE information and precautions. RA/JSA and Certificate, that are attached to the PTW, are to be used as a guideline for


the tool-box talk. TBT’s are now consolidated with, and are integral part of, the PtW! Toolbox is a short presentation to the workforce on a single aspect health and safety. Supervisor


ensure that TOOL BOX TALKS HAVE BEEN PERFORMED, for every job BEFORE THE JOB STARTS, prepare and sign the minutes of these meetings an attached this to the permit > Why do we run Safety 


Meetings? *Inform workers of changes to company procedures, Identify new hazards and review existing hazards *Develop/review hazard controls, Discuss/review accident and incident data


*Employee participation, Communication *Discuss programmes, Develop/review work processes *Short training sessions 5_S SAFETY HANDBOOK FREE DOWNLOAD LINK IS HERE_ My publication will take


about 2 hour with reading totally. I have divided my publication into seven parts. 1st Part: Natural Requirement of a Work Permit. I will give a few basic definitions regarding to permit to


work system. 2nd Part: Formal Ways Definition 3th Part: When is PTW required ? 4th Part: Permit to Work Family ! 5th. Part: Simultaneous Operations (You are here) > 6th Part: Examples of 


tasks requiring PTW (You are here this part) _6.1 Cold Work Permit_ _6.2 Hot Work Permit_ _6.3 The Radiography Work Permit_ _6.4 Confined Spaces Work Permit_ _6.5 Excavation Work Permit_


_6.6 Hazard Energies Isolation Certificate & Lock-Out- Tag-Out (LO-TO)_ _6.7 Grating/Handrail Removal & Open Hole Certificate for Construction_ 6.8 Working At Height Work Permit >


 7 TH PART: I GIVE YOU SOME FACTS AND FIGURES REGARDING TO PRACTICLE > EXAMPLE PTW AND HOW WE CAN ORGANIZE PERMIT TO WORK SYSTEMS _7.1 TOOLBOX TALK _(YOU ARE READING HERE) _7.2 RA/JSA and


How to fill Job Safety Analysis_ _7.3 Essentials Parts of PTW — First Part PTW Document_ _7.4 How to Monitor PTW System on field ? — First Part PTW Document Location_ _7.5 Essentials Parts


of PTW — Second Part safety precautions_ _7.6 Essentials Parts of PTW__ __Third part related to the issuing, starting and closure of the document_ _7.7 PTW REVALIDATION — Handover_ _7.8


Display Permit to Work Papers_ _7.9 Simple Flowchart Permit To Work Systems_ _7.10 Management Responsibilities &Site Responsibilities_